Change of Plans

A Change of Plans for Depenable when ordered to replace Vigilant on patrol but have engine problems of their own

USS Dependable
Bridge, Engineering

5 JAN 2388, 0940

Crewman Apprentice Callan Brogan had been aboard the Dependablefor about three months and was already qualified as a helmsman, inport watchstander, various bridge stations, and was almost complete with…

View Post


subaroosmiles:

Vader’s Little Princess

(via purloined-in-petrograd)


at Orange County Emergency Services Center

at Orange County Emergency Services Center


seattle-wa:

Dock at Seattle Waterfront by sarabell119 on Flickr.Oh waow… this is probably one of my favorite pictures I’ve ever posted on here. I remember this place in the evenings. I’m really missing Seattle tonight.

seattle-wa:

Dock at Seattle Waterfront by sarabell119 on Flickr.

Oh waow… this is probably one of my favorite pictures I’ve ever posted on here. I remember this place in the evenings. I’m really missing Seattle tonight.


at Starbucks

at Starbucks



A Visit to Engineering

The CO makes a Visit to Engineering prior to engine testing

USS Dependable, Engineering
5 JAN 2388, 09:37

“Level two diagnostic complete–impulse engines running at 99.7% efficiency. Power bleed off within acceptable levels,” CN Thomas reported. “Looks like the repair took. Plasma flow normal, gel packs…

View Post


Engineering Casualty

Dependable’s Sister ship has an Engineering Casualty

USS Vigilant, Bridge
5 JAN 2388, 0925

Lieutenant Tyler Hout the Commanding Officer of the USS Vigilant the Dependable’ssister ship sat in his command chair with a canteen of water in his hand.   He drank from it as he stared intently at the main viewing…

View Post